Work Packages

In summary:

  • WP1 - Project Management
    Task 1.1 Coordination between EU-BR consortia (co-leaders i2CAT and UFPA)
    Task 1.2 Quality Control EU (leader i2CAT)
    Task 1.3 Quality Control BR (leader UFPA)
    Task 1.4 Reporting EU (leader i2CAT)
    Task 1.5 Reporting BR (leader UFPA)
    Task 1.6 Financial Management and Cost Claims EU (leader i2CAT) 
    Task 1.7 Collaboration tools (leader i2CAT)

  • WP2 - Building and operating the Brazilian facility 
    T2.1 – Requirements analysis (M1-M3), leader: RNP
    T2.2 – Development of infrastructure/substrate (M4-M18), leader: UFPA
    T2.3 – Development of control and monitoring framework (M4-M30), leader: UFSCar
    T2.4 – Operation of the facilities (M04-M30), leader: RNP

  • WP3 - Building and Operating the European Facility
    T3.1 Detailed analysis of the new use cases and requirements specification (M1-M4), leader: i2CAT
    T3.2 Infrastructure update, (M1-M9), leader: University of Bristol
    T3.3 Enhancement to the OFELIA control framework (M5-M30), leader: i2CAT
    T3.4 Enhancement of the OMF control framework and the OML measurement framework (M5-M30), leader: UTH
    T3.5 Operation of the facility (M1-M30), leader: University of Bristol
    T3.6 Liaison with the FIBRE-BR testbed development (M1-M30), leader: RNP

  • WP4 - Federation of facilities
    T4.1: Analysis of the Federation requirements (M1-M12), leader: UPMC
    T4.2: Contribution to the Federation framework (M4-M24), leader: UFRJ
    T4.3: Federation Software Tools (M8-M30), leader: UNIFACS/UFPA
    T4.4: Federation Physical Interconnection (M12-M30), leader: RNP

  • WP5 - Development of technology pilots and showcases 
    Task 5.1: Design and Development of Technology Pilots (M09-M18) - Leader: University of Bristol / CPqD
    Task 5.2: Preparation and Integration of local and federated showcases (M19 – M24) – Leader: University of Bristol / CPqD 
    Task 5.3: Validation of local and federated facilities and showcases (M20 – M30) – Leader: University of Bristol / CPqD

  • WP6 - Dissemination and Collaboration
    Task 6.1 – Production and organization of dissemination material (M1-M30), leader: RNP/UTH
    Task 6.2 –Organization of workshops, tutorials and other events (M1-M30), leader RNP/UTH
    Task 6.3 – Collaboration  (M1-M30), leader UFPA/UPMC


FIBRE WPs


Management Structure


 

Europe flag
This project has received funding from the European Union’s Seventh Programme for 
research, technological development and demonstration under grant agreement No 288356

Brazil flag